← Selected work

Case study 02 Connected heavy equipment

Fleet-Scale Machine Control

Led machine-control and survey integration across a major pipeline program, connecting GNSS, digital terrain models, cameras, sensors, and non-standard equipment configurations.

GNSSGrade controlDigital twinsOEM integrationDrone mapping
Pipeline construction fleet using machine-control systems

Challenge

The system problem

Keep survey, engineering, digital models, and 45 concurrently operating machines aligned across roughly 200 kilometres of active construction without letting field knowledge fragment into silos.

Approach

Integration work

Outcome

What changed

Created a coherent field technology workflow that maintained production continuity, reduced repeated work, and made current survey and engineering information usable at the machine.

45machines supported
~200 kmconstruction program
20surveyors led